Henry County Manufacturer Expands with Addition

Dixline Corporation of Galva, IL will expand its business to accomodate growth. Trotter General Contracting is assisting this growth with the construction of an engineered steel building to connect two existing facilities. A new 8″ water main, new sewer re-route, new storm sewer for surface water and roof water collection, plus the erecting of a 240′ x 80′ steel building, around delicate utilities services, both below and overhead, make for a challenging site. The new building will have dual loading docks, as well.The foundation trench is carved out between the two buildings that will eventually connect. The foundation trench is carved out between the two buildings that will eventually connect.[/caption]

First half-day of Superior Walls foundation panels being set.

First half-day of Superior Walls foundation panels being set.

Almost 350 ft of frost-protected foundation wall set in one day.

Almost 350 ft of frost-protected foundation wall set in one day.

Between rains, the West floor is complete.

Between rains, the West floor is complete.

A new 8" water riser will provide ample supply.

A new 8″ water riser will provide ample supply.

Tall loading-dock walls are formed for East building.

Tall loading-dock walls are formed for East building.

Comments are closed.